Customization: | Available |
---|---|
Style: | Simple |
Color: | White |
Still deciding? Get samples of US$ 1/Square Meter
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Top And Bottom Track Easy Installation Office Soundproof Sliding Wall Partition
Finished Project
Thanks for the trust from the client. We finished the packing and shipped to agent's warehouse on March 4th,2019.
This is a project in Lebanon,8 meters height partitions,using the steal materials,including the steel tracks,the steel rollers and the steel haging clips.
Totally around 480 square meters.
Actually our steel system can support 900 KG materials,so that is enough to support the panels for this project.
Do you still worry about the installtion? Please do not worry,our professional team can help you about that.
For this project,we just delivered the accessories yesterday by air, and we will send our engineer(Mr. Zeng) to Lebanon to supervise the installation.
Installation site of partition wall
1: Installation track
Track is the base, is the priority among priorities of all links, through percussion drilling expansion screws, welding Angle iron and other steel materials fixed up.
2: Insert the door panel
The moving door panels are suspended in the rails without any support on the ground.
3: Installation and debugging
Free and flexible, move the door panels according to whatever you need to change the layout
4: Close against the wall
Convenient collection, save space
Technical Details
Series | BG65 | BG85 | BG100 |
Panel suspension | Top hung only | Top hung only | Top hung only |
Panel thickness | 65mm | 85mm | 100mm |
Max height | 4000mm | 6000mm | 18000mm |
Panel width | 500-1200 mm | 500-1200 mm | 500-1200 mm |
Face material | 9mm | 9mm | 12 mm |
Passdoors | Single door or Double door | ||
Sound insulation | 28-38dB Rw | 28-42dB Rw | 32-50dB Rw |
Finish Material | Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized) |
Parking movable wall system
Close board when, partition wall can be concealed in special store ark, do not affect integral and beautiful
Packing and shipping
Our service
1:Factory direct price
2:Nice quality
3:Quick shipping with 5 days
4:Small order welcome
5:More than 3 years warranty6:Support customer designs OEM ODM service
Factory and case show
FAQ
1:What you should you do on site?
A beam (truss)should built on site for track installation.The minimum distance leaving for track installation from false ceiling to top ceiling is 180mm.
2:How to install?
We will provide the installation manual and video guiding the installation job.We can also dispatch the installation engineer supervising the installation as request.
3:What is lead time ?
The lead time is 7 days to 10days.
4:How to transport?
Sea transport is a common mode of transportation.In an emergency,can be air freight .
5:How do the goods packing?
Carton paper package ,MDF batten cover all around cotner.
6:What is procurement procedure?
Firstly, seng us the shop drawing (if the shop drawings is not available ,you can tell us the height from false ceiling to finfshed floor and width from wall to wall)
Secondly, we offer you the movable wall layout drawings for your confirmation.
Thirdly, we quote the movable wall in acordance with confirmed