Customization: | Available |
---|---|
After-sales Service: | Aluminium Folding Partition |
Warranty: | 3 Years |
Still deciding? Get samples of US$ 1/Square Meter
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Phillippines Workstation Movable Wall Room Dividers Aluminium Folding Partition Price
Technical Details
Series | BG65 | BG85 | BG100 |
Panel suspension | Top hung only | Top hung only | Top hung only |
Panel thickness | 65mm | 85mm | 100mm |
Max height | 4000mm | 6000mm | 18000mm |
Panel width | 500-1200 mm | 500-1200 mm | 500-1200 mm |
Face material | 9mm | 9mm | 12 mm |
Passdoors | Single door or Double door | ||
Sound insulation | 28-38dB Rw | 28-42dB Rw | 32-50dB Rw |
Finish Material | Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized) |
Modernized Soundproof Movable partition | |
1.Hanging on ceiling | The floor without a track, just put the rail mounted on the ceiling |
2.Excellent Quality | Each pieces of partition can turn around 360 degree. |
3.Stable and secure | After partition is stable and reliable, and is not easy to swing |
4.Energy efficient | The large space divided into a small space, in order to reduce air conditioning power consumption; |
5.Heatproof&fireproof | Good heat insulation performance, Adopt effective fire prevention materials |
6.Elegant appearance | Surface any adornment, can unite with indoor adornment effect |
7.Easy to collect | Can be hidden in the special coffer, does not affect the overall appearance |
8.Various applications | Hotels, exhibition halls, restaurants, multi-functional rooms etc. |
Movable Panel Packing Drawing
Finish Option
FAQ
1:What you should do on site?
A beam(truss) should built on site for track installation.The min distance leaving for track installation from false ceiling to top ceiling is 180mm.
2:How to install?
We will provide the installation manual and video guiding the installation job. We can also dispatch the installation engineer supervising the installation as request.
3:What is lead time?
The lead time is 7 days to 10 days.
4:How to transport?
Sea transport is a common mode of transportation. In an emergency, can be air freight.
5:How do the goods packing?
Partition board paper packaging, and finally packed in wooden carton.
The movable wall panel and track, fittings will be packed separately.
6:What is Procurement procedure?
Firstly, send us the shop drawings(if the shop drawings is not available, you can tell us the height from false ceiling to finished floor and width from wall to wall)
Secondly, we offer you the movable wall layout drawings for your confirmation
Thirdly, we quote the movable wall in accordance with confirmed drawings.
7:What is finishing face?
The bottom panel is MDF or plywood, which is unfinished face. You can do decoration on site, such as wallpaper, paint, etc.
We can also provide the product with finished face, such as faux wood, Woven fabric and Leather.
Cooperation steps
Step 1: send us an inquiry.
Step 2: send us detailed engineering drawings or dimensions.
Step 3: we offer solutions and quotes.
Step 4: negotiate and discuss details.
Step 5: place the order and arrange the deposit.
Step 6: make detailed construction drawings and review before production.
Step 7: determine the construction drawing and arrange production.
Step 8: quality control and inspection.(production pictures are provided for verification)
Step 9: arrange shipment after receiving the balance.
Step 10: provide installation drawings
Step 11: after sales service
Phillippines Workstation Movable Wall Room Dividers Aluminium Folding Partition Price
Phillippines Workstation Movable Wall Room Dividers Aluminium Folding Partition Price
Phillippines Workstation Movable Wall Room Dividers Aluminium Folding Partition Price